6 kilometres of Construction of Trunk sewer project including 3.5 kilometres of Microtunnelling, secant piling Deep Manholes etc.

Canal Excavation, Quay wall construction, Rock works shore protection

Construction of New Wharf 160 meter x100meter with Dolphins and associated infrastructure works

Construction of 330 meter long bridge for Pipe lines, bored cast in situ Piling works, Installation of pipe lines etc

Dredging works

Dredging and disposal, re construction of beach, rock works etc

Dredging and disposal, Demolition of existing Jack up Barge jetty 360 mtr. x 70 mtr.

Supply of Rocks

Rock Revetment works

Earthworks and soil improvement work

Sheet piling, secant piling, Dewatering, Excavation , backfilling etc. 60mtr x 20mx 6.5mtr, Reinforced Concrete pump house

Trenching works, Pipe sleeper installation, foundations for AB pipe line Bapco

Construction of Marina – Reclamation. Dredging, Quay walls, Rock revetment works, culverts

Construction of Beach

Supply of Imported Rock Material from Al Hassanain Owned Quarry at Musandam Oman

Construction of New Weir for Bapco

Off Shore Pipe Installation Works

Filling, grading, levelling, Road works, Bridge with Piling Works, Fencing etc

Reclamation and Shore Protection Works

Construction of Quay Wall Temporary Jetty