Engineering, Procurement, Construction and Commissioning. Trenching and Backfilling for 1x32" FG Trunkline with 2x8" conduits (piggybacking) of 2km .

Trenching and Backfilling for 2x10" HDPE conduits of 2km ea. For pulling 2x FOC cables for SPM

Interim access and infrastructure including connections to sanitary sewer network

Trenching and Backfilling for 3x 42" pipelines each 1.05km length
Installation of 2x24" 6.2km gas subsea pipelines and FOC from WVS (Wharf Valve Station) to HMS (Hidd Metering Station)
Marine Work- 1.9 km x 3no. 24” (Kerosene, Naptha & Diesel), 1km x 1no. 14" (Gasoline), 1km x 2no. 3" (I/A & N2) u/w p/l installation works and cabling (FOC)

Deep gravity trunk sewer line (DGS)

Repair of boat ramp

Installation of onshore and offshore of outfall and intake GRP pipes.

Dredging, Intake and outfall pipe installation – Marine Pipe line works

Supply and installation 4 kilometres of 2800mm dia Concrete Sewer pipes, 2 kilometres of 2400 mm dia micro-tunnelling outfall pipe line in the sea

Dredging and disposal, re construction of beach, rock works etc
Supply & Installation of 95 piles (raked and vertical) with steel modular super structure to support and carry pipelines and E&I from shore to wharf.

Installation of HDPE Intake Pipelines OD 3000mm (2 No.) for 800m each inclusing installation of two intake tower and HDPE Outfall Pipeline OD 2850mm (1 No.) for total length 2,450m including diffuser.

Reclamation, Shore protection, Beach construction etc.

Reclamation, Dredging, Quay walls, Rock revetment works

Deep gravity micro tunnelling Pipe works

Rock Revetment works, Concrete culverts etc

Reclamation of Plot of approx.- 125,000m2, Pipe culverts

Dredging, Intake and outfall pipe installation – Marine Pipe line works